Following a successful competitive tender submission, Premier Compliance UK Ltd was appointed by Betsi Cadwaladr University Health Board to undertake a comprehensive fire door replacement programme at a General Hospital.
The project involved the removal and replacement of 32 fire door sets throughout the hospital, significantly enhancing the building's compartmentation and reducing overall fire risk while ensuring continued compliance with current fire safety standards with all fire doors being installed and certified through our BM TRADA Q-Mark Certification.
Our Approach Working closely with the client's representative, Steven Morgan, we developed a detailed fire door specification to ensure every door set was manufactured to meet the operational and fire safety requirements of the hospital. The installation programme included a variety of door configurations, including:
Single fire doors Double fire doors Fire-rated side screens Fire-rated fanlights Several installations were located within high-risk clinical areas, requiring meticulous planning, careful sequencing of works and close coordination with hospital staff to minimise disruption to critical healthcare services.
The project also incorporated specialist access control systems, which were integrated into the door design and installation process to ensure full compatibility with the hospital's existing security infrastructure.
Experience That Delivered Results Having partnered with Betsi Cadwaladr University Health Board for over seven years, our team understood the Trust's expectations for quality, workmanship and operational delivery. This established relationship enabled us to proactively manage the programme, anticipate challenges and deliver a solution that met the client's exacting standards.
Project Outcome The project was completed on time, within programme and without any operational issues or disruption to hospital services.
Throughout the works, Premier Compliance UK Ltd maintained exceptional standards of health and safety, quality control and contract management, ensuring all installations complied with the agreed specification and relevant fire safety regulations.
The client provided outstanding feedback upon completion, commending the team for:
Excellent quality of workmanship Professional contract management Exceptional health and safety standards Efficient planning and delivery Collaborative approach throughout the project The successful completion of this scheme further strengthened our long-standing relationship with Betsi Cadwaladr University Health Board and demonstrated our capability to deliver complex fire safety projects within live healthcare environments.